عنوان انگلیسی Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)
چکیده انگلیسی مقاله Resource constrained project scheduling problem (RCPSP) is mainly investigated with the objective of either minimizing project makespan or maximizing project net present value. However, when material planning plays a key role in a project, the existing models cannot help determining material ordering plans to minimize material costs. In this paper, the RCPSP incorporated with the material ordering problem is first formulated into a NP-hard optimization model. Then, two hybridized meta-heuristic algorithms are proposed to solve the integrated problem. In addition, statistical methods are employed to tune the parameters of both algorithms. Finally, computational results for a set of test problems taken from the project scheduling problem library (PSPLIB) are presented.
کلیدواژه‌های انگلیسی مقاله

نویسندگان مقاله S.T.A. Niaki |
Industrial Engineering, Sharif University of Technology

Amir Abbas Najafi |
Industrial Engineering, K.N. Toosi University of Technology

Nima Zoraghi |
Industrial Engineering, Islamic Azad University, Qazvin Branch

B. Abbasi |
School of Mathematical and Geospatial Sciences, RMIT University


نشانی اینترنتی http://www.ije.ir/article_72530_16d86a3b4724a053ebaaeacc493fef7c.pdf
فایل مقاله اشکال در دسترسی به فایل - ./files/site1/rds_journals/409/article-409-2062506.pdf
کد مقاله (doi)
زبان مقاله منتشر شده en
موضوعات مقاله منتشر شده
نوع مقاله منتشر شده
برگشت به: صفحه اول پایگاه   |   نسخه مرتبط   |   نشریه مرتبط   |   فهرست نشریات