این سایت در حال حاضر پشتیبانی نمی شود و امکان دارد داده های نشریات بروز نباشند
صفحه اصلی
درباره پایگاه
فهرست سامانه ها
الزامات سامانه ها
فهرست سازمانی
تماس با ما
JCR 2016
جستجوی مقالات
جمعه 21 آذر 1404
Iranian Journal of Fuzzy Systems
، جلد ۹، شماره ۳، صفحات ۲۷-۴۵
عنوان فارسی
MULTI-OBJECTIVE OPTIMIZATION WITH PREEMPTIVE PRIORITY SUBJECT TO FUZZY RELATION EQUATION CONSTRAINTS
چکیده فارسی مقاله
This paper studies a new multi-objective fuzzy optimization prob-
lem. The objective function of this study has di
erent levels. Therefore, a
suitable optimized solution for this problem would be an optimized solution
with preemptive priority. Since, the feasible domain is non-convex; the tra-
ditional methods cannot be applied. We study this problem and determine
some special structures related to the feasible domain, and using them some
methods are proposed to reduce the size of the problem. Therefore, the prob-
lem is being transferred to a similar 0-1 integer programming and it may be
solved by a branch and bound algorithm. After this step the problem changes
to solve some consecutive optimized problem with linear objective function on
discrete region. Finally, we give some examples to clarify the subject.
کلیدواژههای فارسی مقاله
Fuzzy relation equation، Preemptive priority، Branch &، Bound، Multi objective، Linear objective، Optimal solution، Binding variable،
عنوان انگلیسی
MULTI-OBJECTIVE OPTIMIZATION WITH PREEMPTIVE PRIORITY SUBJECT TO FUZZY RELATION EQUATION CONSTRAINTS
چکیده انگلیسی مقاله
This paper studies a new multi-objective fuzzy optimization prob-
lem. The objective function of this study has di
erent levels. Therefore, a
suitable optimized solution for this problem would be an optimized solution
with preemptive priority. Since, the feasible domain is non-convex; the tra-
ditional methods cannot be applied. We study this problem and determine
some special structures related to the feasible domain, and using them some
methods are proposed to reduce the size of the problem. Therefore, the prob-
lem is being transferred to a similar 0-1 integer programming and it may be
solved by a branch and bound algorithm. After this step the problem changes
to solve some consecutive optimized problem with linear objective function on
discrete region. Finally, we give some examples to clarify the subject.
کلیدواژههای انگلیسی مقاله
Fuzzy relation equation, Preemptive priority, Branch &, Bound, Multi objective, Linear objective, Optimal solution, Binding variable
نویسندگان مقاله
Esmaile Khorram |
Faculty of Mathematics and Computer Science, Amirkabir Uni- versity of Technology, 424,Hafez Ave.,15914,Tehran, Iran
Vahid Nozari |
Faculty of Mathematics and Computer Science, Amirkabir University of Technology, 424,Hafez Ave.,15914,Tehran, Iran
نشانی اینترنتی
http://ijfs.usb.ac.ir/article_145_8b38e0f7556e356816be47b4ddb2691a.pdf
فایل مقاله
فایلی برای مقاله ذخیره نشده است
کد مقاله (doi)
زبان مقاله منتشر شده
en
موضوعات مقاله منتشر شده
نوع مقاله منتشر شده
برگشت به:
صفحه اول پایگاه
|
نسخه مرتبط
|
نشریه مرتبط
|
فهرست نشریات