این سایت در حال حاضر پشتیبانی نمی شود و امکان دارد داده های نشریات بروز نباشند
International Journal of Engineering، جلد ۳۶، شماره ۶، صفحات ۱۱۵۰-۱۱۶۵

عنوان فارسی
چکیده فارسی مقاله
کلیدواژه‌های فارسی مقاله

عنوان انگلیسی The Equipment Scheduling and Assignment Problem in the Overhaul Industry
چکیده انگلیسی مقاله In this article, equipment overhaul is considered in a multi-stage flow shop scheduling problem. In this problem, the equipments are disassembled in the first stage, overhaul and repairs are done on the equipment in parallel workshops in the second stage, and the assembly operation is done in parallel workshops in the third stage. Considering a three-stage overhaul with parallel machines in the second and third stages is new in the overhaul industry. The sequence of equipment processing is determined in the first stage, as well as the allocation and sequence of equipment in the second and third stages should be done in such a way that the total completion time of jobs is minimized. Unlike most articles, the sequence of processing jobs is not the same in all stages and changes with the use of decoding. For the next innovation: in order to solve the problem, a new mathematical model is presented. Two new improved algorithms, Genetic Algorithms (GA) and Particle Swarm Optimization (PSO) are presented to solve the problem in large dimensions. By using the shortest processing time (SPT) heuristic, these two algorithm have been improved and Hybrid GA (HGA) and Hybrid PSO (HPSO) algorithms have been presented. In order to achieve better results with the current conditions, the parameters setting is done by one-way analysis of variance (ANOVA). Finally, it is possible to improve the performance of the equipment by applying the discussed issues.
کلیدواژه‌های انگلیسی مقاله Genetic Algorithm,Flow shop,Shortest processing time,Particle Swarm Optimization

نویسندگان مقاله M. Torkashvand |
Department of Industrial Engineering, University of Kurdistan, Sanandaj, Iran

N. Shamami |
Department of Industrial Engineering, Faculty of Industrial and Mechanical Engineering, Qazvin Branch, Islamic Azad University, Qazvin, Iran

H. Bigdeli |
Department of Mathematics, University of Birjand, Birjand, Iran


نشانی اینترنتی https://www.ije.ir/article_169091_d4e11a805c1c9293f326229c3a256e6c.pdf
فایل مقاله فایلی برای مقاله ذخیره نشده است
کد مقاله (doi)
زبان مقاله منتشر شده en
موضوعات مقاله منتشر شده
نوع مقاله منتشر شده
برگشت به: صفحه اول پایگاه   |   نسخه مرتبط   |   نشریه مرتبط   |   فهرست نشریات