عنوان انگلیسی Case Study in Increasing Overall Equipment Effectiveness on Progressive Press Machine Using Plan-do-check-act Cycle
چکیده انگلیسی مقاله Press automotive components manufacturer in Indonesia with the Overall Equipment Effectiveness (OEE) achievement was 60.7%, it was below than world company level as mention in Japanese Institute of Plant Maintenance (JIPM)- Total Productive Maintenance (TPM) standard, the biggest OEE components problem was availability value that achieved 63.3%, then the biggest availability problem was dies preparation time. Using TPM method and Plan-Do-Check-Act (PDCA) cycle with Pareto chart and Fishbone diagram, we succeeded to improve dies setting time within one months. We could increase the availability value from 63.3% became 67.8% and finally OEE value increased from 60.7% became 65.3%.
کلیدواژه‌های انگلیسی مقاله Total Productive Maintenance,Availability,Overall Equipment Effectiveness,Plan-do-check-act Cycle

نویسندگان مقاله C. Jaqin |
Industrial Engineering Program, Mercu Buana University, Jakarta, Indonesia

A. Rozak |
Industrial Engineering Program, Mercu Buana University, Jakarta, Indonesia

H. Hardi Purba |
Industrial Engineering Program, Mercu Buana University, Jakarta, Indonesia


نشانی اینترنتی https://www.ije.ir/article_118850_358a7fd8b17833ecce118219a506f08d.pdf
فایل مقاله فایلی برای مقاله ذخیره نشده است
کد مقاله (doi)
زبان مقاله منتشر شده en
موضوعات مقاله منتشر شده
نوع مقاله منتشر شده
برگشت به: صفحه اول پایگاه   |   نسخه مرتبط   |   نشریه مرتبط   |   فهرست نشریات