عنوان انگلیسی Evaluation of mining labor impact on production: Application of TOPSIS-CRITIC based multiple criteria decision making approach
چکیده انگلیسی مقاله The productivity of the quarry during the wet season heavily depends on how well the personnel adjusts to the mine's environmental conditions and management plans. The improvement of granite production through workers' impact identification and mining advancement decision-making in Ondo State, Nigeria, has been considered in this study. The rate of granite production and the factors influencing workers’ efficiency were assessed using a well-structured survey and descriptive-analytic technique. To improve the production rate, the Multiple Criteria Decision-Making (MCDM) technique was used to select the most productive pit depending on a number of key labor impact factors. Health and safety in employment, the energy crisis, market conditions and level of competition, on-site accidents, natural disasters, and language barriers were some of the factors identified as external influencer factors affecting mine labor efficiency in granite quarrying. Finally, using the criteria's significance through the inter-criterion (CRITIC) approach, the mine workers’ influence on production was estimated and utilized for the best pit selection. The result of the MCDM revealed that the five pits (Pit 1, Pit 2, Pit 3, Pit 4, and Pit 5) had the following decision performance scores: 0.659, 0.617, 0.5, 0.5, and 0.5, respectively. This made Pit 1 the best production pit to be considered during the rainy season. The optimal solution was validated with the 2021 production report. The report shows that production from Pit 1 had the highest revenue of $16,000 Per annum, the lowest dewatering cost, and the highest production rate compared to the other four pits.
کلیدواژه‌های انگلیسی مقاله mining, Production improvement, granite aggregate, TOPSIS score analysis, Decision-Making approach

نویسندگان مقاله Blessing Olamide Taiwo |
Mining Engineering, Federal University of Technology Akure, Nigeria

Melodi Mbuyi Mata |
Mining Engineering Department, Federal University of Technology Akure

Raymond Oluwadolapo Aderoju |
Geology Department, Federal University of Technology Akure

Mojisola Tosin Falade |
Chemistry Department, Federal Polytechnic Ede

Yewuhalashet Fissha |
Department of Geosciences, Geotechnology and Materials Engineering for Resources, Graduate School of International Resource Sciences, Akita University, Japan

Oluwaseun Victor Famobuwa |
Department of Mining Engineering, West Virginia University, USA

Adams Abiodun Akinlabi |
Department of Mining Engineering, Federal University of Technology, Akure, Nigeria

Ojo Augustine Thomas |
Department of Mining Engineering, West Virginia University, USA


نشانی اینترنتی https://ijmge.ut.ac.ir/article_95271_412fce784e14aa126788ee04de7c2492.pdf
فایل مقاله فایلی برای مقاله ذخیره نشده است
کد مقاله (doi)
زبان مقاله منتشر شده en
موضوعات مقاله منتشر شده
نوع مقاله منتشر شده
برگشت به: صفحه اول پایگاه   |   نسخه مرتبط   |   نشریه مرتبط   |   فهرست نشریات