این سایت در حال حاضر پشتیبانی نمی شود و امکان دارد داده های نشریات بروز نباشند
صفحه اصلی
درباره پایگاه
فهرست سامانه ها
الزامات سامانه ها
فهرست سازمانی
تماس با ما
JCR 2016
جستجوی مقالات
چهارشنبه 26 آذر 1404
International Journal of Mining and Geo-Engineering
، جلد ۵۰، شماره ۲، صفحات ۱۷۵-۱۸۱
عنوان فارسی
چکیده فارسی مقاله
کلیدواژههای فارسی مقاله
عنوان انگلیسی
Application of Truncated Gaussian Simulation to Ore-Waste Boundary modeling of Golgohar Iron deposit
چکیده انگلیسی مقاله
Truncated Gaussian Simulation (TGS) is a well-known method to generate realizations of the ore domains located in a spatial sequence. In geostatistical framework geological domains are normally utilized for stationary assumption. The ability to measure the uncertainty in the exact locations of the boundaries among different geological units is a common challenge for practitioners. As a simple and informative example of such a boundary, one can consider the boundary between ore and waste materials in an ore deposit. This boundary addresses the percentages of the ore and the waste, and also affect the future economy of mine and all precedent mine designs and mine plans. Deterministic approaches, based on interpretation of geological phenomenon, provide just one scenario of ore-waste variation, and do not offer a model for uncertainty of boundaries. On the other hand, geostatistical simulations, based on stochastic models, can measure the uncertainty of such a boundary. Through different techniques for spatial simulation of the categorical data (geological domains) truncated gaussian simulation has been proved to be versatile when geological units have sequential geometries and/or there are few number of indicators (ore and waste). This study addresses the application of TGS for conditional simulation of ore and waste domains in Golgohar iron ore deposit. Separation of the ore and waste domains has affected the ore tonnage estimation and resource evaluation. Various simulations can be considered as the spatial realizations of ore and waste. TGS can generate realizations of the domains and measure the uncertainty of ore-waste boundary. The accuracy of result has been checked through performance evaluation section and different scenarios (e.g. best, average and worst). The best scenario is the one with the most accuracy that is calculated from confusion matrix. The scenario No. 44 with 96 million cubic meters tonnage has an accuracy over 86 percent that is proposed as the best scenario for future mine design and planning.
کلیدواژههای انگلیسی مقاله
نویسندگان مقاله
امید اصغری |
ut
فاطمه amirpoursaeid |
simulation and data processing laboratory, school of mine engineering, college of engineering, university of tehran
سازمان اصلی تایید شده
: دانشگاه تهران (Tehran university)
نشانی اینترنتی
http://ijmge.ut.ac.ir/article_59826_c859064fa9f0655f7493063d319cb41c.pdf
فایل مقاله
اشکال در دسترسی به فایل - ./files/site1/rds_journals/421/article-421-311321.pdf
کد مقاله (doi)
زبان مقاله منتشر شده
en
موضوعات مقاله منتشر شده
نوع مقاله منتشر شده
برگشت به:
صفحه اول پایگاه
|
نسخه مرتبط
|
نشریه مرتبط
|
فهرست نشریات