این سایت در حال حاضر پشتیبانی نمی شود و امکان دارد داده های نشریات بروز نباشند
Journal of Industrial and Systems Engineering، جلد ۱۰، شماره Issue ۱، صفحات ۰-۰

عنوان فارسی
چکیده فارسی مقاله
کلیدواژه‌های فارسی مقاله

عنوان انگلیسی A branch and bound algorithm to minimize the total weighted number of tardy jobs and delivery costs with late deliveries for a supply chain scheduling problem
چکیده انگلیسی مقاله In this paper, we study a supply chain scheduling problem that simultaneously considers production scheduling and product delivery. jobs have to be scheduled on a single machine and delivered to customers for further processing in batches. The objective is to minimize the sum of the total weighted number of tardy jobs and the delivery costs. In this paper, we present a heuristic algorithm (HA) and a branch and bound (B&B) method for the restricted case, where the tardy jobs are delivered separately, and compare these procedures with an existing dynamic programming (DP) algorithm by computational tests. The results of computational tests show significant improvement of the B&B over the dynamic programming algorithm.
کلیدواژه‌های انگلیسی مقاله

نویسندگان مقاله مرتضی راستی برزکی | morteza rasti
department of industrial and systems engineering, isfahan university of technology, isfahan 84156-83111, iran
سازمان اصلی تایید شده: دانشگاه صنعتی اصفهان (Isfahan university of technology)

سید رضا حجازی | seyed reza
department of industrial and systems engineering, isfahan university of technology, isfahan 84156-83111, iran
سازمان اصلی تایید شده: دانشگاه صنعتی اصفهان (Isfahan university of technology)


نشانی اینترنتی
فایل مقاله فایلی برای مقاله ذخیره نشده است
کد مقاله (doi)
زبان مقاله منتشر شده en
موضوعات مقاله منتشر شده
نوع مقاله منتشر شده
برگشت به: صفحه اول پایگاه   |   نسخه مرتبط   |   نشریه مرتبط   |   فهرست نشریات