عنوان انگلیسی A Project Scheduling Method Based on Fuzzy Theory
چکیده انگلیسی مقاله In this paper a new method based on fuzzy theory is developed to solve the project scheduling problem under fuzzy environment. Assuming that the duration of activities are trapezoidal fuzzy numbers (TFN), in this method we compute several project characteristics such as earliest times, latest times, and, slack times in term of TFN. In this method, we introduce a new approach which we call modified backward pass (MBP). This approach, based on a linear programming (LP) problem, removes negative and infeasible solutions which can be generated by other methods in the backward pass calculation. We drive the general form of the optimal solution of the LP problem which enables practitioners to obtain the optimal solution by a simple recursive relation without solving any LP problem. Through a numerical example, calculation steps in this method and the results are illustrated.
کلیدواژه‌های انگلیسی مقاله

نویسندگان مقاله احمد سلطانی |
sharif university of technology and engineering research institute, ministry of agricultural jahad, p. o. box 13445-754, tehran, iran
سازمان اصلی تایید شده: دانشگاه صنعتی شریف (Sharif university of technology)

رسول حاجی |
department of industrial engineering, sharif university of technology, p. o box 11365-9414, tehran, iran
سازمان اصلی تایید شده: دانشگاه صنعتی شریف (Sharif university of technology)


نشانی اینترنتی http://www.jise.ir/article_3918_df96a7fb6694f0b730ab1d9aa78e3c47.pdf
فایل مقاله فایلی برای مقاله ذخیره نشده است
کد مقاله (doi)
زبان مقاله منتشر شده en
موضوعات مقاله منتشر شده
نوع مقاله منتشر شده
برگشت به: صفحه اول پایگاه   |   نسخه مرتبط   |   نشریه مرتبط   |   فهرست نشریات